A UPS is a battery unit that keeps your server, NAS or network gear running through a power blip and shuts it down safely in a longer outage. We choose the right size, install it, set up automatic shutdown and test it. It suits any office where a sudden power cut could damage data or halt work.
Last updated 25 November 2026
Power cuts rarely come with a warning. A flicker in the middle of a database write can corrupt files, and a sudden shutdown of a NAS can leave its drives in a mess. A UPS is a small, sensible bit of insurance against that.
We size the unit to what you plug in, choose the right type, connect it to your equipment and set it up to shut things down tidily. We also tell you roughly when the battery will be due for replacement.
Sounds familiar?
- The server or NAS has shut down unexpectedly after a power flicker
- Your router and switch drop out whenever the lights blink
- You have an old UPS that beeps and nobody knows why
- A power cut has corrupted files or a database before
- You are adding a server or NAS and want to protect it
- Your building has frequent brownouts or lightning-prone power
Line-interactive or online UPS
A line-interactive UPS suits most small offices. It smooths minor voltage swings and switches to battery in milliseconds. An online UPS constantly runs your gear from the inverter, giving cleaner power for critical servers, but it costs more and runs warmer. We explain which suits your kit and budget.
Sizing for runtime
UPS capacity is rated in volt-amps and watts, and runtime depends on the load. We add up what you will plug in, such as server, NAS, switch and router, then pick a unit that holds it for long enough to shut down safely, with room to grow. Oversizing wastes money, undersizing defeats the point.
Safe shutdown and alerts
Many UPS units connect by USB or network to tell your server when the battery is low. We configure that, so Windows Server or your NAS shuts down tidily before the battery runs out. We can also set email alerts for power events and failing batteries.
Plugging in and low-voltage only
We connect the UPS to the gear it protects and test by simulating an outage. We do not do 230 V electrical work, so if a new power point is needed near the rack, an electrician fits it. We recommend leaving laser printers off the UPS.
How the job goes
- List the equipment. We note what needs protecting, such as server, NAS, switch and router, and how long you want it to run in an outage.
- Quote and choose. We recommend a size and type with a free written quote. The unit and any extras are agreed with you before we order.
- Install and connect. We place the UPS, plug in the protected equipment, connect the monitoring cable or network card and set up shutdown rules on the server or NAS.
- Test and hand over. We simulate a power loss to check runtime and shutdown, then leave a note on battery checks and when to expect replacement.
Before we arrive
- Check there is a working power point near the rack or desk
- List every device you want the UPS to protect
- Avoid planning to plug in laser printers or heaters
- Tell us how long you would like the gear to stay up
- Arrange for an electrician if a new power point is needed
What it costs
Free quote - priced for your site before any work starts. We look at the site, then send a written quote you can accept or ignore. Small fixes on the same gear are billed at our normal rates below.
| What | Incl. GST | + GST |
|---|---|---|
| First hour onsite | $169 | $146.96 |
| Call-out, each onsite visit | $20 | $17.39 |
| Each half hour after the first hour | $69 | $60 |
| Remote session (no travel) | $69 | $60 |
| First hour, SuperGold card holders (home visits) | $149 | $129.57 |
| Cabling, CCTV, servers, rollouts and other projects | Free quote | |
Common problems we fix
- UPS beeping: what the alarm meansUPS alarm sounding at the server or desk? Here is how to read it and what to do safely.
- Office network down after a power cutPower is back but the network is not. Start things up in order and find the device that did not recover.
Questions people ask
How big a UPS do I need?
It depends on the total load of the gear you plug in and how long you want it to run. We add up the watts, choose a unit with headroom, and check the expected runtime before you buy.
What is the difference between line-interactive and online?
Line-interactive units switch to battery when power drops and smooth minor swings. Online units run equipment from the battery path all the time, giving cleaner power. Most small offices do well with line-interactive.
How long does a UPS battery last?
Batteries wear out gradually and usually need replacing every few years, sooner in warm rooms. We set up alerts and test the runtime, so you get notice before it matters.
Can I plug a printer into the UPS?
Avoid laser printers, which draw a big surge when warming up and can overload the unit. Plug in your server, NAS, switch and router instead. Printers can stay on a normal power point.
Do you install new power points?
No. We do low-voltage work only, not 230 V electrical work. If a point is needed near your rack, an electrician fits it, and we can set up the UPS once it is ready.
Related help
- Data & Photo RecoveryDeleted photos, a dead drive or a corrupted memory card? We attempt careful recovery.
- Starlink InstallationStarlink dish mounted, cable run and Wi-Fi set up, with a free written quote first.
- Remote Tech HelpWe connect to your computer over the internet and fix it while you watch, at a flat rate per session.
- Mac Help & RepairMacBook, iMac or Mac mini slow, full or misbehaving? We help at home or the office.
- Onsite Business IT SupportA technician at your workplace for the PC, email, printer and network problems that stall your day.
- Monthly IT Care PlansRegular checks, patching and visits for your office, quoted per site and month to month.
